Civil Engineering Construction in Sri Lanka
Accepted Contract sum: 33,000,000.00
Contract Basis – design and build – Lump Sum
Road Length 1.2 Km
Completion date – 10/08/2024
Current Physical Progress – 80%
Scope of work
Preliminary & General, Site Clearing, Rock Blasting,Drainage System, Construction Of Culverts, Construction Of Retaining Structures, Road Base, Surface Dressing