This is the fast-track project handled by our company in Building Sector as a Main Contractor
The client is Ceylon Biscuits Limited and the Consultant is Ceylon Biscuit Limited – Group Engineering.
(Year 2023)
Value of work done – More than 150 Million Rupees
Project Period – 11 Months – Fast Track Projects – More than 10 Nos of Projects
Scope of Works
Works consisted of several types of Civil Construction and Renovation projects handled by our teams
with very critical periods with setting out works, surveying, sample approvals, testing, quality control,
assurance, technical supervision & and all project management. Also, this project does the inner side
and external side of the factory building. We are executing a very tight construction program within
factory shutdowns and we arrange two shifts of laborers and officers for every project (Average 50 Nos
and 04 Nos Officers ). We completed and handed over these projects within the project period as well.
Brief of Executed Projects Work Items Given Below
Demolishing Area : 850 Sq.m
Structural Steel : 60 Ton
Sandwich Panel with Frames : 1,500 Sq.m
Tempered Glass : 500 Sq.m
Aluminum Works : 400 Sq.m
Cladding Works : 1500 Sq.m
Roofing Works with Frames : 600 Sq.m
Roofing Works with Frames : 600 Sq.m
Ceiling Works : 2,000 Sq.m
Roller Doors : 12 Nos
Plumbing Works : 450 L.m
PPR Plumbing Works : 250 L.m
Trenching & Reinstatement : 300 L.m
Concrete Works : 110 Cu.m
Reinforcement Weight : 40 Tons
Masonry Works : 1,200 Sq.m
Plastering Works : 3,000 Sq.m
Painting Works : 4,000 Sq.m
Asphalt Road Works : 1,200 Sq.m
RCC Drainage : 500 L.m
Road Kerbs : 400 L.m
ABC Laying : 500 Cu.m
Cover Slabs : 1000 Nos
CBL PROJECTS PHOTOGRAPHYS