Proposed Construction for The Design & Construction of Road At Lot -X ,Devon Janapathaya, Pathana for Getwin Agro(Pvt)Ltd

 

Accepted Contract sum: 33,000,000.00

Contract Basis  – design and build – Lump Sum

Road Length 1.2 Km

Start Date – 10-Jun-24   

Completion date – 10/08/2024

Current Physical Progress – 80%

Scope of work

Preliminary & General, Site Clearing, Rock Blasting,Drainage System, Construction Of Culverts, Construction Of Retaining Structures, Road Base, Surface Dressing

 

 

 